Shakespeare Theatre
![]() |
Washington, DC
Scope of Work:
The theatre’s transformable interior can be configured with a proscenium, thrust, semi-arena or bare stage. J.R. Clancy provided a proscenium arch that can change size, or be flown out of sight and stored in the fly space. The first five rows of seats are on two wagons with air bearings, allowing them to be moved. A large demountable trap system, acoustical reflector, 50 counterweight rigging sets, and rope rigging were also provided.
Owner:
Shakespeare Theatre Company
Architect:
Consultant:
Contractor:
Clark Construction
Completion:
2007
More Information:
|




